design

Design & Build

Design & Build Biogas System Design – Energy360 Combustion Systems – Utilising our highly experienced inhouse operations & design team Energy360 can design, manufacture, install and commission your biogas project with all the necessary regulatory approvals. Combustion systems – We provide all the key elements for an integrated combustion system including: Calculations including Heat & Mass…

Biomethane GREEN GAS

Biomethane – GREEN GAS

Biomethane GREEN GAS Scott Morrison has renewed plans to overhaul Clean Energy Finance Corporation so it can invest in carbon capture and storage (CCS), promising a $500 million investment ( matched by the private sector) in emerging technologies. The federal government believes real progress is being made in CCS technology, but many climate scientists COP26…

AWITE distributor

AWITE Distributor

AWITE Distributor AWITE Products proudly distributed & serviced by Energy360 in Australia. AWITE expertise is all about gases and their processes. They analyze, desulphurise and automate the process. No matter whether agricultural or industrial biogas plants, biogas upgrading or grid injection, landfill gas, communal or industrial WWTPs, lab or power-to-gas applications. There is a suitable analysis.…

OEF FLARE - ENERGY 360

Biogas flare delivery

Biogas Flare  Another Australian made biogas flare packed and on its way to Brisbane. Made at our factory in Carrum Downs, Melbourne, the flare will work as an emergency flare alongside biogas generators at a STP.   Energy 360 Pty Ltd   https://energy360.com.au/wp-content/uploads/2021/07/ENERGY-360-SKID-PLACEMENT.mp4   Energy360 are leaders in the design, manufacture and operation of bioenergy…

RENEWABLE GAS

Renewable gas

Renewable gas is required in Australia….’biomethane will play a critical role in decarbonising the Australian gas industry….APGA Don’t phase out gas connections – decarbonise the gas with renewable gas…. APGA urges ACT to reconsider gas connections phase-out plan APGA has urged the ACT Government to reconsider its plans to phase out gas connections in a…

Ask 4 Renewablegas

Ask 4 Renewablegas

Ask 4 Renewablegas – Energy360 #askforrenewablegas When it comes to ‘GREEN POWER’ consumers want to know – Exactly what am I purchasing? Marketing the ’renewable energy’ space has always been a conundrum for Energy providers: A 2014 final report formulated by leading Government accreditation programme GREENPOWER reported 3 key findings PEOPLE ARE CONFUSED They don’t…

ENERGY360

Biogas System Design

Biogas System Design – Energy360 Combustion Systems – Utilising our highly experienced inhouse operations & design team Energy360 can design, manufacture, install and commission your biogas project with all the necessary regulatory approvals. Combustion systems – We provide all the key elements for an integrated combustion system including: Calculations including Heat & Mass Balance Operation Manuals…

current biogas projects

Current Biogas Projects

Current Biogas projects under construction : OEF 100 Flare OEF 100 Flare : Current Biogas project under construction Biogas flare and gas handling equipment – Designed and constructed at Carrum Downs, Victoria 3201   Specifically designed for the client based on our standard ABM branded, SEF flare (Sectional Enclosed Flare) with the modification on stack and…

Renewable Gas - Australia

Renewable Gas – Biomethane in Australia

RENEWABLE GAS : Biomethane in Australia Biomethane is interchangeable with natural gas and is produced from organic material (waste and agricultural residues). There is a potential national resource of 371PJ p.a. currently not being utilised to its full potential. This equates to 80% of east coast domestic gas demand (1) ! Renewable gas as we…

biomethane gas for trucks

GREEN GAS – Biomethane for trucks

GREEN GAS : The potential for renewable gas in truck fleets Biomethane isn’t a focus for the Australian government but as its a reality in Europe perhaps it should be. Switching from diesel to Compressed Natural Gas is a solution that can happen in a matter of years not decades….and if the biomethane is sourced…