FLARE FOR LANDFILL GAS

OEF 300 Flare for Landfill Gas

Flare for Landfill Gas – OEF 300 Location: Landfill site in Victoria Equipment overview: This is a newly designed flare for landfill gas, fully enclosed flare capable of 3,000m3 hr, with re-engineered pipeline placements. Using a PD (Positive Displacement) Blower, the biogas is extracted from the gas wells embedded in the landfill site at high pressure. New…